About Us - News
   
A five-stage process with automated dissolved oxygen control provides a reliable, efficient and highly compliant solution for a new Florida reclamation plant.
Tweet

Published in TPO Magazine.


When designing the 22.5 mgd Central Water Reclamation Facility in Cantonment, Fla., Baskerville-Donovan engineers specified oxidation ditches. The technology was familiar because the 8.2 mgd (design) Bayou Marcus sister facility had a four-stage biological nutrient removal (BNR) system.

WesTech Engineering won the bid for the project, which replaced the outdated and undersized Main Street Wastewater Plant.

Read the full article here.

Published by

Tags: In The Press