WesTech News > About Us > WesTech Engineering

Step by Step

Written by WE&T Magazine. | December 10, 2013

Published in TPO Magazine.

When designing the 22.5 mgd Central Water Reclamation Facility in Cantonment, Fla., Baskerville-Donovan engineers specified oxidation ditches. The technology was familiar because the 8.2 mgd (design) Bayou Marcus sister facility had a four-stage biological nutrient removal (BNR) system.

WesTech Engineering won the bid for the project, which replaced the outdated and undersized Main Street Wastewater Plant.

Read the full article here.

Published by