
Published by Treatment Plant Operator Magazine
When designing the 22.5 mgd Central Water Reclamation Facility in Cantonment, FL, Baskerville-Donovan engineers specified oxidation ditches. The technology was familiar because the 8.2 mgd (design) Bayou Marcus sister facility had a four-stage biological nutrient removal (BNR) system.
WesTech Engineering won the bid for the project, which replaced the outdated and undersized Main Street Wastewater Plant.
Published by